Prototype and development hardware for aircraft and propulsion programmes: lightweight structural parts, brackets and interface plates machined on multi-axis equipment, to your drawing and material documentation requirements.

SPECIFICATION

TYPICAL PARTS
Structural brackets, interface plates, prototype hardware
PRIMARY ROUTE
5-axis and multi-axis CNC machining
COMMON MATERIALS
Aluminium 7075 and 6061, titanium, stainless steel, PEEK
An aircraft and propulsion display illustrating aerospace development
Aerospace development

APPLICATION REQUIREMENTS

What decides the design here.

Four things shape the route before a tool is selected. If any of them is unknown at enquiry, we say so instead of assuming a default.

Read the design guide
03.1

Functional datums

The features that locate the part in the assembly. The datum structure drives the setup plan and the inspection method.

03.2

Material documentation

Grade, specification and the certificate that has to accompany the material. State it at enquiry so it can be sourced with the order.

03.3

Weight and structural intent

Which sections carry load and which only close the envelope. Thin walls and deep pockets are machined differently from solid structure.

03.4

Qualification expectations

Inspection coverage, first-article reporting and any customer-specific requirements that apply before a production commitment.

PARTS WE MAKE

Parts for this application,
and the geometry that shapes them.

Workshop photographs of real geometry. Each one carries the route, what the machine has to reach, what is checked, and what you need to state on the drawing.

See more part geometry
Detailed machined part shown beside small cutting tools

Multi-axis structural detail

Tool access to pockets at compound angles and the cutter lengths needed to reach them. Longer cutters deflect more, which is what limits how thin a wall can go.

ROUTE5-axis millingCHECKEDWall sections and setup faces
STATE ON THE DRAWING

Indicate the faces requiring a single setup and the critical wall sections.

Manufactured component with cylindrical features and mounting holes

Interface plate

Hole-pattern accuracy, flatness and the relationship between the bore and the mounting face. These three decide whether the assembly bolts up without shimming.

ROUTECNC millingCHECKEDHole pattern and face flatness
STATE ON THE DRAWING

Mark the datum faces, hole tolerances and any surfaces that must remain flat.

Manufactured plate with fine winding channels

Thin-wall ribbed panel

Fine channel width against the cutter diameter, and the minimum rib that will not chatter. Thin ribs move during cutting unless the route plans for it.

ROUTECNC millingCHECKEDMinimum rib and channel width
STATE ON THE DRAWING

State the minimum rib thickness, the channel width and whether sharp corners are required.

PROCESSES, MATERIALS AND FINISHES

The routes used for these parts.

Not every route suits every part. These are the ones that come up most for this application; the quote states the route chosen for your geometry and quantity.

All capabilities

Finishing changes dimensions: coating thickness, masking and any effect on a mating fit are agreed before the route is fixed, not discovered at inspection.

INSPECTION AND DOCUMENTATION

What we measure, and what we record.

The inspection scope is agreed with the order. Anything you need recorded has to be stated before machining starts, because it cannot be reconstructed afterwards.

Tolerancing standards
Coordinate measuring machine probe in the Prolean inspection area

Dimensional inspection

Datums, bore sizes and mounting patterns measured against your drawing, with the method agreed before production.

A surface roughness tester beside a calibration block

Surface roughness

Roughness measured where the drawing calls it out, on sealing, sliding and contact faces.

Our handheld alloy analyser in its protective case

Material verification

Alloy grade checked before machining. Certificate scope is agreed with the material order, not added afterwards.

Where a programme requires verification we cannot give in-house, independent third-party testing or inspection can be arranged. The scope and the cost are agreed in the quote, not added later.

AGREED BEFORE THE ORDER STARTS

  • 01Drawing revision and the datum structure it defines
  • 02Material specification and the certificate that must accompany it
  • 03Inspection coverage and first-article report format
  • 04Deburring and edge-break requirements
  • 05Identification and traceability marking, if required
  • 06Packing and protection for development hardware

APPROVED CASE STUDIES

Case studies for this application.

A case study needs approved objective, process, inspection and result records. We do not publish a project until that approval exists.

STATUS

Case studies are being prepared for publication.

The part photographs above are workshop images of real geometry. They show what can be made, not a completed project: material, tolerance, quantity and delivery results are published only where the customer has approved the record. Until then, the fastest way to see whether your part fits our route is an engineering review.

QUESTIONS

Aerospace questions.

The questions that come up for this application. Anything not covered here goes to an engineer.

Are you AS9100 certified?

No. We hold ISO 9001:2015 through SGS. We supply development and prototype hardware with the inspection records you specify, and we do not manufacture under an AS9100 quality system. Where your programme needs independent verification, third-party testing can be arranged and the scope agreed in the quote.

Can you supply material with full certification?

Yes where the grade is available with certification. Tell us the specification at enquiry – traceability has to be arranged with the material, not added afterwards.

Do you make flight hardware?

We make development and prototype hardware. Whether a part is releasable for flight is your programme is decision and your certification to make; we do not make that determination.

How do you hold a datum through multiple setups?

The setup plan follows the datum structure on your drawing. If a part needs several setups, we agree which features are machined together and record the sequence.

How is the lead time set?

From geometry, material sourcing and inspection scope. Certification requirements are part of that, so they need to be stated early.